Projects

May 01, 2009
Category: Projects
Posted by: webmasterfds568zq
Gentec has developed the Green Fuels Nigeria Ltd pilot natural gas compression facilities from concept to commissioning, with the largest installed capacity in Africa today.
Feb 09, 2009
Category: Projects
Posted by: webmasterfds568zq
First commercial IPP in Nigeria developed on a complete turnkey basis by Gentec, with an opening capacity of 8.75 MWe, planned for up to 15 MWe by end 2009
Aug 01, 2004
Category: Projects
Posted by: administrateur_ds5qk
The Scania attenuated gas genset based power plant for First Aluminium in Nigeria has been commissioned and is now operational.
Aug 01, 2004
Category: Projects
Posted by: administrateur_ds5qk
Gentec has commissioned the first gas power station for Shongai Packaging Industries to provide continuous power to the factory 24 hours a day.
Jun 01, 2004
Category: Projects
Posted by: editor_fdso5rze
Gentec has recently installed and commissioned the first ever 1 MW Perkins gas genset in Nigeria, for Reliance Textiles.
Feb 01, 2004
Category: Projects
Posted by: editor_fdso5rze
Gentec has commissioned the fifth gas power plant.  This was developed in Aba, Nigeria, for International Glass Industries.
Feb 01, 2004
Category: Projects
Posted by: editor_fdso5rze
The fourth gas power station in Nigeria has been developed and commissioned, for Avon Crowncaps in Otta.
Mar 01, 2003
Category: Projects
Posted by: editor_fdso5rze
The development and commissioning of a 1000 kVA power station with auto synchronisation has been completed for Chandra Spinning Mills in Bangladesh.
Oct 01, 2002
Category: Projects
Posted by: editor_fdso5rze
The third gas power station in Nigeria, and the first in Otta's industrial district, has been commissioned.  The station has been developed for Kolorkote Nigeria, a part of the Tower group.
Mar 01, 2002
Category: Projects
Posted by: editor_fdso5rze
Gentec has commissioned the second Gas Power Station in Nigeria - the first in Lagos's Ikeja industrial district. The power station is for Cook n Lite, and is now operating and supplying continuous power.
Jan 10, 2002
Category: Projects
Posted by: editor_fdso5rze
The natural gas based power plant for First Aluminium Port Harcourt has been commissioned and is now providing power to the site.
Jan 01, 2000
Category: Projects
Posted by: editor_fdso5rze
Gentec completed an expansion on the power station at Sreepur Textiles to add on 1000 kVA of capacity with full auto synchronisation.


Site Made with CMS Made Simple - Design Groupe Wibi